top of page

How Long Does it Take Us to Draft Your Plans in CAD?

  • nfrederick42
  • Apr 22
  • 1 min read

This can vary widely based on several factors, including:


Simple plans (like a basic floor plan) may take a few hours, while complex projects (like detailed architectural sets) can take several days or even weeks.


Clear and detailed information provided by the client can speed up the drafting process. If the we need to clarify details or make revisions, this can extend the timeline as well!


Different CAD software have varying capabilities and learning curves, which can impact drafting speed and if we have to redraft a project into our title blocks with our notes it does take longer.


Larger projects with multiple components or revisions will naturally take longer to draft than smaller projects.


On average, for a standard residential project, it might take anywhere from a few days to a couple of weeks. For larger commercial projects, it could take several weeks to months!

 
 
 

Recent Posts

See All

Comments


© 2020 Copyrighted by LGS Design and Drafting
  • Youtube
  • Instagram
bottom of page